Consultant to collect, review, assess, and analyze onsite data conditions through site visits, condition assessments, field surveys, LIDAR surveys, etc. Field surveys and onsite data collection methods to be determined after reviewing data collection per Task 2 and determining the need for information for completeness. This task aims to verify the capacity of Redwood Creek (upstream and downstream of downtown Redwood City) as well as considering downstream storm drain pump stations’ impacts on the creek. Consultant to investigate property boundary lines and perform a boundary survey for all proposed alternatives as the result of task 9. This is to confirm feasibility of the alternatives, and to select a preferred project...