Surface Preparation • Inspect the existing gym floor surface prior to work. • Clean and prepare the floor to remove dirt, dust, grease, and any debris. • Sand the entire floor surface in Project Area. • Protect adjacent surfaces, walls, and equipment from dust, overspray, or paint spills. Layout & Design • Striping layout shall be applied as indicated in project drawings. A digital striping plan/layout drawing and color selection submittal shall be submitted by Contractor to City for approval prior to work being performed. • Provide clear marking for the following courts and markings to be consistent with As-Built Layout: o Basketball court (main and auxiliary if applicable). o Volleyball court(s). o Badminton court(s). o Pickleball court(s). o Any additional specialty markings (logos, lettering, custom graphics). Striping Application • Use high-quality, gym floor–approved paint specifically designed for wood/urethane surfaces. • Apply paint in multiple coats as necessary.