0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090105 TIME-RELATED OVERHEAD (LS) LS LUMP SUM 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 10 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 60 0006 090214 SAFETY QUALITY CONTROL MANAGER LS LUMP SUM 0007 100100 DEVELOP WATER SUPPLY LS LUMP SUM 0008 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0009 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0010 120110 FLASHING ARROW SIGN EA 5 0011 120120 TYPE III BARRICADE EA 200 0012 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 1,790 0013 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 154,000 0014 120195 TRAFFIC DRUM EA 1,160 0015 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 720