0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 430 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 5 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 100 0006 090214 SAFETY QUALITY CONTROL MANAGER LS LUMP SUM 0007 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0008 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0009 120110 FLASHING ARROW SIGN EA 5 0010 120120 TYPE III BARRICADE EA 7 0011 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 4,430 0012 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 519,000 0013 120165 CHANNELIZER (SURFACE MOUNTED) EA 530 0014 017772 PORTABLE LIGHTING SYSTEMS (LS) LS LUMP SUM 0015 120300 TEMPORARY PAVEMENT MARKER EA 9,070 0016 017773 TEMPORARY BARRIER SYSTEM (CAL F-23) LF 161,000 0017 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0018 129108 TEMPORARY CRASH CUSHION TL-3 EA 40 0019 129150 TEMPORARY TRAFFIC SCREEN LF 159,000 0020 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 11