Specifications include, but are not limited to: Includes all work associated with the installation of two pickleball courts, one basketball court, exercise stations, bioswale and treatment basin; this does not limit to the installation of sidewalks, stairs, post-tension slab, site furnishings, lighting, structural fencing, vegetation and irrigation.; erosion control, traffic control, clearing and grubbing, removing art statue, grading and drainage, biofiltration basin, storm drains, concrete paving, sport courts, fencing, outdoor exercise area, site furnishings, lighting and security system conduit, tree transplanting, planting, and irrigation system.; Clearing and Grubbing, QTY 26,442 SF; Remove Art Statue, QTY 1 EA; Site Grading, QTY 1,264 CY; Over Excavation & Undercut, QTY 628 CY; Concrete Paving, QTY 6,185 SF; Concrete Exercise Area Curb, QTY 42 LF; Cast-In-Place Concrete Seat Wall, QTY 57 LF; Rubberized Surfacing, QTY 996 SF; Concrete Steps per Modified SDRSD M-26, QTY 95 SF; Railing per Modified SDRSD M-24 (Stairs), QTY 22 LF; 8" Metal Trench Grate Cover, QTY 8 LF; Park Light, Type "A3" (includes concrete base), QTY 4 EA; Park Light, Type "A2" (includes concrete base), QTY 2 EA; Park Light, Type "B" (includes concrete base), QTY 4 EA; Park Light, Type "B1" (includes concrete base), QTY 4 EA; Park Light, Type "B2" (includes concrete base), QTY 3 EA; Lighting Electrical System, QTY 1 LS; Security Camera Conduit, QTY 1 LS; Metal Inlet Cover, QTY 5 EA; Adjust Inlet to Grade, QTY 8 EA; Catch Basin Type G-1 per SDRSD D-08, QTY 1 EA; Catch Basin Type F per SDRSD D-07, QTY 1 EA; 18" RCP, QTY 8 LF; Biofiltration Area Cleanout per detail on sheet CN-1, QTY 3 EA; Biofiltration per BMP Design Manual BF-1, QTY 2,100 SF