A. Consultant shall develop a detailed work program outlining the cost and time required to complete each proposed task: • Develop space requirements and detailed site plan, including streetscape and landscape plans, utility plans, and erosion control/grading plans. • Develop conceptual site plans with the Town’s project committee • Create detailed building design and layout • Develop project cost update report • Present 30%, 60% and 90% plans to Historic Preservation Advisory Committee, and Planning Commission • Prepare and acquire state and local permits for construction. (building permit, stormwater permit) • Coordinate and attend weekly formal meetings with Town’s project committee to include Transportation Program Manager, Engineering Project Manager, and Planning representative • Coordinate a public information meeting at 60% completion. • Prepare bid ready plans and specifications for contractors. It is the responsibility of the Consultant to provide copies of all project documents to all parties involved in the project. • Obtain Topographic Survey of parcel from existing sources • Review existing geotechnical reports to determine foundation needs. B. While the existing site is somewhat constrained as a result of Phase 1 and Phase 2A construction, Consultant shall conduct a comprehensive assessment of space requirement needs for employee and customer amenities such as waiting areas break room for a staff maximum of 4 and minimum of 2, and other potential common area amenities (i.e. vending machine area, etc). This assessment will include requirements for compliance with Americans with Disabilities Act of 1990 (ADA) as amended...