• DESIGN, FURNISH, AND INSTALL A PREFABRICATED STEEL TRUSS BRIDGE • BRIDGE LIGHTING • STRUCTURE EXCAVATION AND BACKFILL OF THE BRIDGE • BRIDGE DECK REINFORCEMENT AND CONCRETE • BRIDGE FOUNDATION WORK (PILES, ABUTMENTS, MAT FOUNDATIONS, WINGWALLS, REINFORCEMENT, AND ALL OTHER FOUNDATION COMPONENTS) • SLOPE PAVING (CONCRETE) • STRUCTURAL CONCRETE AND REINFORCEMENT (APPROACH SLAB) • EARTHWORK AND GRADING, TO TOP OF SUBGRADE IN ROADWAY AREAS; TO TOP OF FINISH GRADE GRADED SLOPES • CREEK REALIGNMENT • UTILITY CONDUITS INTEGRATED WITHIN THE BRIDGE STRUCTURE AND TERMINATED WITH STUB OUTS TO ACCOMMODATE FUTURE CONNECTIONS: EASTSIDE: 14-IN DUCTILE IRON WATER LINE ON SIDE OF BRIDGE (STUB OUT AT SHOULDER/ROADWAY) WEST SIDE (UNDER SIDEWALK OF BRIDGE STUB OUT AT SIDEWALK) CITY: 4-IN CONDUITS (FIBER OPTIC) FUSCO (PRIVATE): 2-IN CONDUITS (CA TV) 4-IN CONDUITS (TELEPHONE/COMMUNICATIONS) 6-IN CONDUITS (PG&E) – PRIVATE 4-IN CONDUIT (PG&E) – PRIVATE 1.5-IN CONDUIT (CALTRANS) PG&E PLANS: (STUB OUT AT SHOULDER) 2-IN CONDUIT (ASOUND BROADBAND) 3-IN CONDUITS (CHARTER COMMUNICATIONS) 2-IN CONDUITS (AT&T COMMUNICATIONS (EST.)) 2-IN CONDUIT PG&E