Specifications include, but are not limited to: The Project is a renovation of an existing 32,637 square-foot building comprised of the original single-story gymnasium building, constructed in 1935, and a two-story east wing and single-story west wing, built in 1949, with several renovations since they were constructed. The building is classified as mixed, non-separated occupancies (A-4, A-3 and A-3) and is Type VB construction. The scope of work comprises remodeling the gymnasium, fitness center, locker rooms, equipment room, classrooms and offices. It includes hazardous material removal, a full seismic retrofit, selective demolition, replacement of exterior windows, replacement of the HVAC systems, replacement of the electrical systems, replacement of the lighting systems, replacement of the plumbing systems, a new security system, new AV system and equipment, a new elevator and exterior stairways, new roofing, new flooring and wall finishes, removal and infill of an existing swimming pool to convert it into an outdoor exercise space with a small running track, selective landscaping and site drainage, new paving and accessible parking and resurfacing the existing parking lot. The project includes the following DSA deferred submittals: telescoping bleachers at the gymnasium, elevator guide rails and anchorage, window wall spans in excess of 10’-0” and skylights