Specifications include, but are not limited to: This project encompasses the rehabilitation of the historic palm springs plaza theatre originally constructed in 1936, including: Expanded conditioned lobby area, new glazed doors and windows, renovated inner lobby with new bar/ concessions area, new theater seats, with a leveled floor area for wheelchair accessible seating, repair of the historically significant atmospheric sidewalls and ceiling, historic finishes treatments for the stenciling at the lobby and proscenium, as well as restoration of the historic light fixtures, renovation of the restrooms with new fixtures and accessories, a reconfigured stage, with expanded apron, and new resilient stage floor, new theatrical equipment, including theatrical lighting truss, grid, and drapery. new a/v and surround sound systems, modernized dressing rooms, with restrooms and showers, with a new accessible star dressing room at the stage level, additional acoustical finishes treatments and sound control improvements throughout, completely new HVAC systems, and electrical service equipment. The structural scope includes a seismic upgrade to the historic building and structural upgrades to accommodate renovations to the theatre. Abatement plans and a report has been prepared for this project and shall be followed throughout any demolition or installation. Install new wired (POE) security system with up to 16 camera locations throughout the building and exterior. System shall connect to new networking equipment located within the building in Room 208 as shown on the plans. Wiring shall be installed within conduit and conduit painted to match existing wall color. Where possible, conduite shall be concealed. The east access path to the back of the Theatre includes removal of existing concrete, grading, compacting, and installation of concrete to meet current ADA standards, removal of existing door and roll up gate, installation of new metal 4” square steel frame gate with stained IPE wood as horizontal panels spaced 1/4”. The drains that connect to the roof along the wall to the floor shall also be replaced and connect to a new pipe placed underground and connect to the outlet at the face of curb along Indian Canyon Drive.