Specifications include, but are not limited to: 0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 535 0003 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 11 0004 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0005 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0006 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0007 120204 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY EA 90 0008 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0009 130100 JOB SITE MANAGEMENT LS LUMP SUM 0010 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 0011 130330 STORM WATER ANNUAL REPORT EA 2 0012 130505 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) EA 2 0013 130520 TEMPORARY HYDRAULIC MULCH SQYD 40,100 0014 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 11 0015 130640 TEMPORARY FIBER ROLL LF 20,500 0016 130650 TEMPORARY GRAVEL BAG BERM LF 700 0017 130730 STREET SWEEPING LS LUMP SUM 0018 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 0019 200002 ROADSIDE CLEARING LS LUMP SUM 0020 202006 SOIL AMENDMENT CY 78