0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 500 0003 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 10 0004 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 100 0005 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0006 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0007 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 4,434 0008 120165 CHANNELIZER (SURFACE MOUNTED) EA 35 0009 017460 TEMPORARY BARRIER SYSTEM (MASH TL-3) LF 2,123 0010 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0011 129108 TEMPORARY CRASH CUSHION TL-3 EA 10 0012 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 20 0013 130100 JOB SITE MANAGEMENT LS LUMP SUM 0014 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0015 130321 STORMWATER SAMPLING AND ANALYSIS DAY EA 5 0016 130331 STORMWATER ANNUAL REPORT EA 5 0017 130570 TEMPORARY COVER SQYD 22,300 0018 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 250 0019 130640 TEMPORARY FIBER ROLL LF 1,050 0020 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 1