• Diversion pump system: includes pump house foundation, pump house superstructure, diversion pumps, and appurtenances. • Pretreatment system: includes building foundation, pretreatment building, skidmounted filtration system, skid-mounted UV system, backwash pump, and appurtenances. • Raw water storage tank pad, foundation, and appurtenances: includes grading, trenching, and drainage, tank foundation, raw water piping at tank site, and in-tank aeration system. The Tank will be provided and assembled by others. • Raw water conveyance pipeline: includes (1) installation of approximately 1,850 linear feet of 4” diameter C900 Polyvinyl Chloride (PVC) water pipeline (2) installation of approximately 1,300 linear feet of 6” diameter C900 PVC water pipeline and (3) above-ground ductile iron yard piping. Also includes trenching and road resurfacing. • Electrical infrastructure: Project activities also include installing electrical infrastructure needed to operate the above project components. • SCADA components installation: Installation of SCADA components is included in the project activities. Programming on the SCADA system will be performed by State Parks service provider.