1. AGENCY SHALL BE RESPONSIBLE FOR OPERATION OF ALL WATER VALVES. 2. CONTRACTOR SHALL MAINTAIN OWNER ACCESS TO ALL FACILITIES AT ALL TIMES. OBTAIN WRITTEN APPROVAL BY WATER GENERAL MANAGER FOR PLANNED CLOSURES OR ACCESS RESTRICTIONS SEVEN (7) CALENDAR DAYS IN ADVANCE. 3. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT CONTAMINATION OF ADJACENT FACILITIES DURING CONSTRUCTION INCLUDING DURING REMOVAL OF COATINGS AND COATING APPLICATION. PREVENT BLAST MATERIAL AND COATING OVERSPRAY FROM REACHING FENCING, ASPHALT CONCRETE, AND NEARBY STRUCTURES. 4. RETAIN COPIES OF THE PLANS AND SPECIFICATIONS FOR THIS PROJECT ON-SITE DURING CONSTRUCTION. 5. VERIFY DIMENSIONS AND CONDITIONS AT THE SITE BEFORE STARTING WORK. ANY CONFLICTS BETWEEN DETAILS OR DIMENSIONS ON THE DRAWINGS SHALL BE REPORTED PROMPTLY TO THE OWNER'S REPRESENTATIVE WHO WILL DETERMINE THE INTENT OF THE DRAWINGS. 6. TAKE PRECAUTIONARY MEASURES TO PROTECT UTILITIES AND STRUCTURES SHOWN AS WELL AS ANY AND ALL OTHERS NOT OF RECORD OR NOT SHOWN ON THESE PLANS. ALL SUCH IMPROVEMENTS OR STRUCTURES DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR RECONSTRUCTED TO ORIGINAL DESIGN CONDITION AND/OR THE APPLICABLE REQUIREMENTS OF THE AFFECTED UTILITY AT THE CONTRACTOR'S EXPENSE. APPROVAL BY OWNER AND/OR THE UTILITY OWNER SHALL ALSO BE REQUIRED. 7. LIMIT CONSTRUCTION ACTIVITIES TO THE ESTABLISHED CONTRACTOR STAGING AND WORK AREAS. 8. ALL SPECIFICATIONS, DRAWINGS, AND DETAILS INCLUDED IN THE CONTRACT DOCUMENTS SHALL FULLY APPLY TO THE WORK WHETHER SPECIFICALLY REFERENCED OR NOT. 9. PROVIDE VIDEO DOCUMENTATION OF THE EXISTING CONDITIONS OF THE PROJECT SITE AND SURROUNDING AREA. SUBMIT THE VIDEO TO THE OWNER PRIOR TO THE START OF CONSTRUCTION PER SPECIFICATION SECTION 011100. 10. MAINTAIN THE WORK AREA IN A NEAT, CLEAN, AND SANITARY CONDITION AT ALL TIMES AND TO THE SATISFACTION OF THE OWNER AND OWNER'S REPRESENTATIVE. STREETS AND DRIVEWAYS SHALL BE KEPT CLEAN OF DEBRIS, WITH DUST AND OTHER NUISANCES BEING CONTROLLED AT ALL TIMES. 11. MAINTAIN A COMPLETE AND ACCURATE RECORD OF ALL CHANGES IN CONSTRUCTION FROM THAT SHOWN IN THESE PLANS AND SPECIFICATIONS FOR THE PURPOSE OF PROVIDING A BASIS FOR RECORD DRAWINGS. NOTE DEVIATIONS FROM THE PLANS ON A SET OF PLANS SPECIFICALLY SET ASIDE FOR THIS PURPOSE. ANY CHANGES SHALL BE MADE ON THE ORIGINALS OF THE PLANS. NO CHANGES FROM THAT SHOWN ON THESE PLANS AND SPECIFICATIONS SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE OWNER'S REPRESENTATIVE