Specifications include, but are not limited to: There are many phases of work pertaining to SFPUC contracts. Potential conflicts arise out of progressive participation in various phases of that work. Set forth below are general guidelines regarding when participation in a specific phase of work may create a conflict. Because an actual determination regarding whether a conflict exists depends upon the specific facts of each situation, the general guidelines set forth below should be treated only as a starting point. A Proposer should consult with their legal counsel to determine whether a potential conflict exists. 1. RFI/RFQ/RFP/Bid Documents. Any entity that participates in the development of any of these documents has participated in “making the contract� for the work. For these purposes “participating in making� has the same meaning as under Government Code Section 1090 and the term “entity� includes any parent, subsidiary or other related business. 2. General Program Management Services. Since these advisory services necessarily assist in general definitions of the program and projects, conflict would likely exist in participation in the design or construction management phase of any project. 3. Preplanning. Participation in preplanning work, which may include the needs assessment report, since it is an initial phase, would likely be limited only by previous participation in preparation of RFI/RFQ/RFP or bid documents. 4. Planning. The planning phase of any project establishes the facts pertaining to the project and possible options for consideration. a) Alternative Analysis Report. This phase proposes to decision-makers the various alternatives in project scope, cost, schedule and environmental impact necessary to make a determination of the proper project. Firms may have a conflict of interest in subsequent design work if they participated in the decision-making process of selecting an alternative.b) Conceptual Engineering Report. This document defines the project and shapes the design contract. Participation in this phase may likely be in conflict with any future design services. 5. Environmental Review. Similar to the planning phase, this phase of work gathers information from other sources resulting in a definition of the project for the purposes of reviewing the environmental effects of the work. Firms participating in environmental review would likely not have a conflict in participating in subsequent phases. 6. Final Engineering Design. Documents produced under this phase constitute the definition of the construction contract. Participation in this phase would likely be in conflict with participation in any subsequent phases, such as construction management or general construction. 7. Construction Management. This work consists of review, assessment and recommendation for actions based on interpretation of contract documents. No firm under one contract can review any of its own work performed under another contract. Conflicts would likely arise had any firm participated in either preparation of final engineering design or any documents enumerated in a contract for construction or documents the SFPUC requires a Proposer to rely on in the preparation of their bid. 8. Construction. It is unlikely that participation in construction contracts would result in conflicts on subsequent contracts. Restrictions on participation in construction contracts may be stipulated in other federal, state or local laws. 9. General. Work associated with gathering, assessing, or reviewing technical data such as geotechnical investigations, site surveys, condition assessments, or cost estimating would likely have conflicts with other work only if the firms were in a position to review their own work. 10. Administrative Services. Any subconsultant or vendor providing general administrative services such as communications, reprographic, janitorial or security services during one phase of a project will not be precluded from providing similar services during later phases of the same project.