In general, work consists of any of the following and blacking out all existing conflicting striping, arrows, and signage before any seal coat is applied. It is the Contractor’s responsibility to verify all dimensions that are applicable, to be discussed at mandatory walk through. A. Sq. Ft. Skin Patch (S/P) B. Sq. Ft. Asphalt Fabric Over/Lay (O/L) C. Sq. Ft. Asphalt Remove and Replace (R & R) D. Sq. Ft. Concrete Repair (CR) E. Entire Parking Lot Sq. Ft. Asphalt Seal Coating (AS) F. Formula (ASPC) Asphalt Seal Prime Coat G. Formula (AS-1) Asphalt Seal 1st Coat H. Formula (AS-2) Asphalt Seal 2nd Coat I. Formula (AS-3) Asphalt Seal 3rd Coat J. Lin. Ft. Rubberized Crack Filler (CF) K. Lin. Ft. Line Striping or as existing L. Number of Handicapped Parking Stalls (per Title 24 & ADA Handicapped Specifications) M. ______ Other (see notes on plans) N. ______ Excavation Depth O. Number of oil spots to be ground P. Number of wheel stops to replace