Rational Oven A. The Contractor will furnish all labor, parts, oil, and materials needed to ensure that the Rational Oven, listed in Exhibit A, Article lll, Equipment List, remains in good operating condition. The Contractor will inspect the equipment annually by performing the following: 1. Check history for errors. 2. Update software as needed. 3. Check the door, handle, and latch, adjust if needed. 4. Check the door gasket(s) and air filter(s), replace if needed. Gemini Oven A. The Contractor will furnish all labor, parts, oil, and materials needed to ensure that the Gemini Oven, listed in Exhibit A, Article lll, Equipment List, remains in good operating condition. The Contractor will inspect the equipment annually by performing the following: 1. Check and adjust the concrete screw in floor. 2. Check and adjust packings in joints. 3. Check and adjust the packings in the door frame. 4. Check and adjust the packings under the door. 5. Check and adjust door lock mechanism. 6. Check and adjust lighting, including cable draining.