Specifications include, but are not limited to: 2. SCOPE: A. Subcontractor shall furnish all labor and equipment to perform the operations necessary to complete all Landscaping operations as indicated on the drawings and specified herein, including but not necessarily limited to the following: B. Subcontractor shall furnish all labor, material, and equipment to perform all operations necessary to complete the installation of all landscaping per City or Governing Agency specifications with Owner's approval. C. Subcontractor shall guarantee all sod and plants materials for 60 days. Irrigation system shall be guaranteed for 1 year from time of acceptance by Owner. D. Subcontractor shall supply all chase pipes as needed under driveways and walkways before concrete is poured. E. Fertilizer tablets for trees and shrubs; F. Pre-emergent weed control in shrub beds. G. All planter areas shall be irrigated by drip irrigation Polyethylene tubing. All control valves shall be pressure regulated. Irrigation system shall have manual shut off valve(s) H. Subcontractor shall wash and/or sweep clean all walks, streets and gutters when landscape operations are complete. I. Subcontractor shall clean-up and haul off daily all scrap material and waste created by landscape operations. J. Subcontractor shall be responsible for landscape maintenance for 30 days after final acceptance by Owner. K. Irrigation system shall have manual shut off valve(s) L. Compact all trenches. m. Replace dead plants and Shrubs after 30 days. n. Always Protect landscape areas against damage.