Contractor to provide all traffic control per the current Federal Highway Administration's (FHWA) Manual on California Uniform Traffic Control Devices (CMUTCD) as amended by the MUTCD California Supplement, Part 6, Temporary Traffic Control. When the work order is for Traffic Control only, the Contractor shall mobilize to the site and set up traffic control in accordance with either the Caltrans Standard Plan T11, Caltrans Standard Plan T12, or Caltrans Standard Plan T13. The Contractor shall be solely and completely responsible for furnishing, installing, and maintaining all warning signs and devices necessary for the proper and continuous safe routing of vehicle and pedestrian traffic during the performance of the work and in accordance with the Standard Plans. The use of flaggers, barricades, and construction signing shall comply with Part 6, “Temporary Traffic Control” of the current edition of the California Manual of Uniform Traffic Control Devices (California MUTCD). The Contract unit price paid for “Flagger-Traffic Control” shall include full compensation for furnishing all labor, subsistence, pickup, signs, cones, and incidentals, and for doing all the work involved in setting up, maintaining, and taking down traffic control, including flagging, placing and installing temporary traffic-handling equipment and devices, proper attire for flaggers, and maintaining traffic, as shown on Standard Plans T11, T12 and T13, as specified in the Standard Specifications and these special provisions, and as directed by REU Staff...