• Main line sewer replacement in various sizes using SDR-35 pipe. Replace all existing laterals in the replaced line in a minimum of 5’length of in kind size with SDR-35 pipe using Fernco transition rubber, or equal; • Main line sewer spot repair in various sizes using SDR-35 pipe. Each spot repair will consist of a total of 19’ of one size of pipe divided into various sizes for repairs in close proximity to one another; • Manhole invert flow line repair; • Manhole ring and cover repair and replacement. City to provide manhole ring and cover. • Uncover and raise manholes to street level; • Perform sewer bypass. Contractor to furnish all equipment, perform traffic control, perform set up/ take down and maintain the bypass thought the entire duration; • Provide proper supervision and appropriate traffic control at the job site during all phases of work; • Unit price to include all staff, material, equipment, supplies, and other associated costs; • Perform all repairs, replacements, and installations to meet City Standards and Specifications; • All affected streets, sidewall, and other above ground areas are to be restored in accordance with the City’s general permit conditions and trench specifications located on the City’s website; • All work to be performed in a safe manner, using the appropriate personal protective equipment and in accordance with the City’s safety practices and job specific contractor requirements; • Upon request, prepare, and submit for approval and acceptance, an Overflow Response Plan specific to the task and in accordance with the City’s Overflow Emergency Response Plan;