Specifications include, but are not limited to: Selective site and building demolition as noted on the Demolition Plan; includes the existing courtyard wall that parallels Avocado Avenue, a portion of the library building pedestrian arcade, the courtyard paving and landscaping, the pedestrian access bridge from Avocado Avenue and a portion of the existing sidewalks and parking lot. The Work includes all site and building construction as indicated in the Contract Documents. The Work includes new utility systems, site paving, curbs, ramps, pavement markings, parking, signage, fences and gates, site lighting and other site features to extent indicated in the Contract Drawings. The Work includes the construction of a new single story 9,814 SF library lecture hall building and associated site work. The Building is to be Type VB Fully-Sprinklered Construction. Additionally, the work includes the construction of a trash enclosure, site walls and security gates. As indicated within the Contract Documents, the Work Includes, but is not limited to: a) New building structures including all exterior finishes, doors, windows, storefronts, curtain wall, covered walkway, interior finishes, casework, specialties and built-in equipment. b) All concrete paving, landscaping and irrigation system. c) Built-in Audio and Visual Equipment. d) Signage and Graphics to the extent indicated on the Drawings and in the Project Manual, Signage Program dated September 6, 2023. e) Wet pipe fire suppression system and fire detection system. f) Plumbing and HVAC (heating, ventilating and air-conditioning) as indicated on the Plumbing, Mechanical and Electrical Drawings. g) Communication equipment, conductors and instruments. Work under the building construction contract shall include conduits, junction boxes, outlet boxes, backboards, conductors and conduit ties between backboards and in the Specifications. h) All infrastructure including conduit, back-boxes, hardware and equipment for Access Control System. i) All underground utilities j) Reporting and maintaining all SWPPP and WQMP.