Specifications include, but are not limited to: 9. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the abovestated project. The general items of work to be done hereunder consist of: Rehabilitation of Murrieta Hot Springs Road from Whitewood Road to Margarita Road (approximately ¾ of a mile in length) includes removal and replacement of pavement failure sections, full width roadway grinding of existing asphalt, placement of asphalt rubber hot mix (ARHM) overlay, detector loop replacement, signing/striping, surveying, miscellaneous concrete removal and replacement, full structural section removal and replacement adjacent to the Warm Springs Creek bridge, and PCC removal and replacement for curb ramps, curb/gutter, spandrel, and cross gutter at the intersection of Weeping Willow Lane and Thoroughbred Lane as shown on the plans, these special provisions/specifications, or as directed by the City Engineer