Vacuum excavation (positive location) first six (6) feet includes mark outs, backfill, hand dig, and report. Standard commercial grade backfill material shall meet the requirements, as described in Exhibit A, Scope of Work Vacuum excavation (positive location) each linear foot after first six (6), includes mark outs, backfill, hand dig, and report. Standard commercial grade backfill material shall meet the requirements, as described in Exhibit A, Scope of Work Special backfill material other than native soil/asphalt/concrete required by City/County/Railroad via Encroachment Permit Probing detection for the horizontal and vertical location includes mark out and report Electronic detection for determining the horizontal and vertical location includes mark out and report CCTV Closed Circuit Television Inspection and robotic control up to first 350' LF includes report CCTV Closed Circuit Television Inspection and robotic control each linear foot after 350' LF includes report Closed Circuit Television float devices up to first 350' LF includes report Closed Circuit Television float devices each linear foot after 350' LF includes report Digital Video File up to first 350' LF includes report Digital Video File each linear foot after 350' LF includes report Video Recording up to five (5) feet includes report Designating with Two-Dimensional mapping including Ground Penetrating Radar includes report