APPLIED ARTS HANDICAP PARKING; The existing Applied Arts asphalt concrete pavement section in the improvement area should be removed deep enough to provide for a minimum of 3 inches of replacement asphalt concrete, or entirely through the existing asphalt concrete course, whichever is deeper. After observation of the removal bottom by the geotechnical representative and any necessary recompaction of the exposed aggregate base course to a minimum of 95 percent of the maximum dry density, the area should be repaved with ¾-inch asphalt concrete in accordance with project specifications. The new pavement should be temporarily marked and should be sealed at least 3 months after placement and then permanently marked with traffic-rated paint. LMC HANDICAP PARKING LOT; The existing LMC Handicap Parking Lot asphalt concrete pavement section in the improvement area should be removed deep enough to provide for a minimum of 3 inches of replacement asphalt concrete, or entirely through the existing asphalt concrete course, whichever is deeper. After observation of the removal bottom by the geotechnical representative and any necessary recompaction of the exposed aggregate base course to a minimum of 95 percent of the maximum dry density, the area should be repaved with ¾-inch asphalt concrete in accordance with project specifications. The new pavement should be temporarily marked and should be sealed at least 3 months after placement and then permanently marked with traffic-rated paint.