The work involves the installation of approximately 2,600 linear feet of 10-inch, 12-inch, and 16-inch C900 PVC water transmission pipe. The work also includes tie-ins to the existing system and two well sites. 1 1 LS Mobilization / Demobilization $ . $ . 2 1 LS Traffic Control $ . $ . 3 1 LS Storm Water Pollution Prevention Plan and Implementation $ . $ . 4 1 LS Sheeting, Shoring, and Bracing / Trench Protection $ . $ . 5 1 LS Construction Surveying $ . $ . 6 1,297 LF 10-inch PVC C900 Pipe $ . $ . 7 695 LF 12-inch PVC C900 Pipe $ . $ . 8 672 LF 16-inch PVC C900 Pipe $ . $ . 9 1 EA 8-inch Gate Valves $ . $ . 10 1 EA 10-inch Gate Valves $ . $ . 11 2 EA 16-inch Gate Valves $ . 12 1 LS Connection to Mojave Well Site $ . $ . 13 1 LS Connection to Snyder Well Site and Existing System $ . $ . 14 1 LS Connection to Exist. System at Snyder and Anita $ . $ . 15 1 LS Connection to Exist. System at Snyder & Valley Blvd. $ . $ . 16 1 EA 1-inch Air Release Valve $ . $ . 17 1 LS Pavement Removal and Replacement $ . $ . 18 1 LS Striping $ . $ . 19 1 LS Record Drawings $ . $