Specifications include, but are not limited to: Installation of a 3.5 mile pedestrian and cycling trail along the Mill Ditch as part of a 7.1 mile network of trails known as the Metropolitan Trails System or Metro Trails. This trail will be constructed along Mill Ditch, on the south side of segments. This will create a major trail loop in the central part of our community. This project will include minor roadway and crossing improvements, ADA ramp upgrades, utility relocations, installation of amenities such as benches, street, and trail lighting, drinking fountains, trash receptacles, bicycle racks, dog waste stations, signage, striping, landscaping and irrigation. Coordination will be required with the City of Fresno, the Fresno Irrigation District, San Joaquin Valley Railroad, Federal Aviation Administration, Fresno Yosemite International Airport, PG&E, AT&T and Caltrans will be required.