Specifications include, but are not limited to: The City of Torrance will be constructing the Residential and Arterial Pavement Improvements beginning Summer 2024. Construction will require various materials testing and observation to ensure construction conforms to the contract documents. The City will be contracting with an engineering firm to provide field/laboratory testing and asphalt plant inspection services to verify that the materials comply with project specifications and special provisions. Project information is posted at: https://www.torranceca.gov/our-city/public-works/civil-and-traffic-engineering/capital-improvement-projects/residential-and-arterial-pavement-improvement-i-159-i-139-fy23-24 The materials testing will include subgrade, crushed miscellaneous base, and asphalt concrete. List and describe all applicable fees. Fees not listed below will not be authorized for payment on any invoices throughout the term of the purchase agreement/order. Pursuant to Section 1770 et seq. of California Labor Code, the minimum prevailing wage rate of per diem wages for each craft, classification, or type of workman needed to execute the Contract shall be those determined by the Director of Industrial Relations of the State and is available in the Office of the City Clerk of the City of Torrance. Certified payrolls shall be submitted by the contractor hired for this work.