GENERAL DESCRIPTION OF WORK: The project would renovate approximately 9,410 asf (10,240 gsf) of vacated space on the second floor of MP200. A make-ready project, which includes the demolition of the second-floor space, is currently underway as a separate, stand-alone project and is expected to be completed by November 2025. The renovated space will provide new patient clinic areas, including check-in, patient infusion bays, isolation rooms, exam rooms, consultation rooms, nurse stations, blood draw stations, offices, and support and storage spaces. The project scope shall include, but not be limited to, the following: • New interior partitions, floor and ceiling finishes, casework, glazing, doors and hardware and new LED light fixtures. • Installation of new pneumatic tube system (one station). • New air handler unit (AHU) and new electrical and plumbing (MEP) upgrades to support the new clinical space and comply with sustainability requirements, including new digitally controlled variable air volume (VAV) boxes, modified medium and low-pressure ducting, and new code-compliant plumbing and electrical fixtures. • Modifications to audio/visual (A/V), nurse call, fire alarm and sprinkler systems to support the new program. • Installation of emergency safety and security systems, including CCTV, ACAMS, and IDS systems.