RMD Admin Office • Install wall-mounted network rack in the IDF cabling nook with battery backup. • Install (48) Cat6A cables to designated locations. • Install surface-mounted raceway where inwall routing is not feasible. • Install and bury: • 12-strand single-mode fiber optic cable. • 25-pair copper cable. • 18 gauge /4 strands burial cable to the Tree Office for access control. • Terminate, test, and label all cabling. RMD Tree Office • Install wall-mounted network rack in the IDF cabling closet with battery backup. • Install (14) Cat6A cables. • Install surface-mounted raceway where inwall routing is not feasible. • Install and bury: • 12-strand single-mode fiber optic cable. • Two (2) Cat6A burial cables. • 100-pair copper cable. • 18/4 burial cable to the Admin Office for access control. • Terminate, test, and label all cabling. RMD RD233 Office • Install wall-mounted network rack in the IDF cabling closet with battery backup. • Install (17) Cat6A cables.