The work to be performed under this contract includes furnishing of all labor, materials, tools and equipment for the Lower Central Interceptor Rehabilitation Project, to rehabilitate the existing Central Interceptor from the Bradshaw/Central Junction Structure to the Influent Junction structure, approximately 6.6 miles. The work consists of rehabilitation by CIPP lining of approximately 1,317 linear feet of 120-inch gravity sewer, 4,627 linear feet of 108-inch gravity sewer, 22,958 linear feet of 102-inch gravity sewer, and 6,129 linear feet of 84-inch gravity sewer and associated work including, but not limited to, pre-lining CCTV inspection, pre-lining cleaning and spoils disposal, CIPP lining, post-lining CCTV inspection, and the construction of lining access shafts and restoration. The Work also consists of the installation of nine (9) cross connections between the Lower Central and Bradshaw Interceptors, rehabilitation of 36 manholes, and the rehabilitation of eight (8) sanitary sewer structures. The Work is within both public right-of-way and easements on private property. The entire project is within the County of Sacramento with some of the alignment within the City of Sacramento limits and other parts within unincorporated Sacramento County.