1 Cold Mill 1 1/2" AC Pavement 20,200 Sq.Ft. 2 Placement of 1 1/2" asphalt pavement 190 Ton 3 Grind concrete walkway flush at all locations where an uplift of 1/4" or greater are found at existing joints 1 Lump Sum 4 Remove, Stockpile, and reinstall concrete wheel stop 11 Each 5 Install new concrete wheel stop 1 Each 6 Install parking stalls white stripe, blue ADA stalls/aisles, and ADA symbols 1 Lump Sum 7 Clean all existing concrete joints and fill all existing joints with caulking 1 Lump Sum 8 Furnish and install 2 posts for sign. Bolt city provided sign to posts. 1 Lump Sum 9 Adjust utility valve boxes and covers to grade 1 Lump Sum 10 Furnish and install new detectable warning surface for existing ramp. 1 Lump Sum 11 Remove and dispose off existing trash receptacles 2 Each 12 Furnish and install new trash receptacle, bolt down to concrete paving 2 Each