0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 200 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 4 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120101 TRAFFIC CONTROL SUPERVISOR DAY 40 0009 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 500 0010 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 84 0011 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 7,500 0012 120165 CHANNELIZER (SURFACE MOUNTED) EA 690 0013 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 1,060 0014 120300 TEMPORARY PAVEMENT MARKER EA 130 0015 017460 TEMPORARY BARRIER SYSTEM (MASH TL-3) LF 14,100 0016 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0017 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 25 0018 128655 TEMPORARY AUTOMATED END OF QUEUE WARNING SYSTEM (TYPE 1) DAY 240 0019 128659 END OF QUEUE MONITORING AND WARNING WITH TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY 10 0020 129100 TEMPORARY CRASH CUSHION MODULE EA 5