(1). The Contractor shall paint the entire interior and exterior and replace cove base throughout the building as identified in this Exhibit and complete the Agreement in conformity with these specifications. a. Work includes painting and finishing of all interior and exterior items and surfaces. The interior shall be three (3) colors, and the exterior shall be three (3) colors as selected by the DMV Project Manager. The exterior block shall be waterproofed. b. Work includes replacement of cove base throughout the building. c. Work includes replacing missing or damaged ceiling tiles. The Contractor shall replace all damaged or stained twelve-inch by twelve-inch (12” x 12”) acoustic ceiling tiles and two-foot by four-foot (2’ x 4’) ceiling tiles. Tiles shall match existing. The DMV Project Manager shall approve of manufacturer and profile. d. Work includes replacing all kickplates on interior doors. Kickplates shall match existing size and color. e. Work includes patching all damaged drywall, filling all holes, and texturing patches, as well as caulking all gaps or cracks on interior trim and drywall. f. Work includes patching all damaged exterior stucco and cracks larger than ¼ inch. Smaller cracks shall be filled with caulking. g. The Contractor shall repair all damaged wood, downspouts, and flashing. h. Work includes painting all exterior bollards, light poles, and handrails. i. Work includes power washing the entire exterior of the building. j. The Contractor shall replace all faded or damaged signage on the exterior of the building k. The Contractor shall paint all curbing around the building l. The Contractor shall remove all signage, bulletin boards, and pictures before painting and remount them after painting (interior and exterior). The Contractor shall move all shelving away from walls and return shelving to original location after painting. B. SPECIFICATIONS FOR INTERIOR AND EXTERIOR PAINTING (1). SUMMARY OF WORK – INTERIOR PAINTING a. The DMV Project Manager shall have final approval of all products and colors. b. The Contractor shall patch, prep, and paint all previously painted wall surfaces with an interior grade semi-gloss latex paint. Hard rocked ceilings shall be painted. The Contractor shall replace any damaged or stained ceiling tiles. The restrooms shall be painted with an interior semi-gloss latex paint. The Contractor shall prep and paint all restroom stalls. Janitor rooms shall be painted. c. Wood surfaces previously finished with a solvent-based product may be recoated with a solvent-based product approved by the DMV Project Manager. Schedule for application of solvent based products shall be pre-approved by the DMV Project Manager. d. The Contractor shall replace all four-inch (4”) rubber cove base with new four-inch (4”) rubber cove base. See specifications for rubber cove base. e. The Contractor shall re-stain or paint all wooden doors. f. The Contractor shall replace scratched or graffiti damaged mirrors in restrooms. g. The Contractor shall replace any damaged or missing ceramic tiles in restrooms. h. The Contractor shall replace all existing kickplates and doorstops on all doors. i. Existing window trim, door frames, handrails, etc. have several coats of existing paint. These areas shall be sanded smooth or scraped before painting. j. The Contractor shall use ELLIS PRIMER 1262 (or pre-approved equal) on all metal surfaces except galvanized aluminum. k. Where wallpaper is present, the Contractor shall remove wallpaper and sand off excess glue to create a surface to accept a skim coat. The Contractor shall apply skim coat and apply primer on top of the skim coat using a one inch (1”) nap roller to create texture, and then apply two (2) final coats of paint. l. The Contractor shall supply air scrubbers that shall be running while painting the interior.