MATERIALS & EQUIPMENT CHARGE FOR THE INSTALLATION SERVICES OF THE ELECTRICAL SWITCHGEAR REPLACEMENT. PERFORM WORK PER STATEMENT OF WORK PROVIDED ON EXHIBIT A. (TAXABLE) PQ 26-00317 COORDINATE WITH EDISON AND MALIBU BUILDING AND SAFETY / PUBLIC WORKS TO OBTAIN PERMITS AND CITY FEES, SHUT DOWN POWER AND REPLACE THE SWITCHGEAR BOX. DISCONNECT/RECONNECT REMOVE AND REPLACE THE 400-AMP ELECTRIC SWITCHGEAR (PROVIDED BY OWNER). REMOVE AND REPLACE THE CORRODED CONDUITS AND PULL NEW 2/0 WIRES FOR ONE UNINTERRUPTED LINE FROM THE 400-AMP GEAR TO THE NEW 200AMP PANEL. PROVIDE AND INSTALL A NEW 100AMP SUBPANEL BESIDES THE 200-AMP PANEL FOR FUTURE USE. COORDINATE THE POWER SHUTDOWN WITH SCE TO REPLACE ELECTRIC SWITCHGEAR. SCHEDULE AND OBTAIN PERTINENT ROUGH /FINAL INSPECTIONS FOR THE REPLACEMENT OF SWITCHGEAR INSTALLATION. RECONNECT THE POWER DISTRIBUTION PANEL AND TEST FOR PROPER OPERATION. BARRICADE, COVER AND PROTECT WORK AREA AT ALL TIMES DURING CONSTRUCTION CLEAN AND HAUL AWAY ALL WORK-RELATED DEBRIS UPON COMPLETION. ALL WORK WILL BE SCHEDULED DURING BUSINESS HOURS OR WEEKENDS.