Contractor shall provide all labor, tools, materials, supplies, parts, travel, traffic control, equipment, and incidentals required to perform State highway right-of-way HMA grinder digouts repair and replacement paving services in the Agreement unit price per ton, A. Area 1 – El Dorado County 1) State Route 49: Begin Post Mile (PM) 0.0 End PM 34.5 2) State Route 50: Begin PM 0.0 End PM 80.44 3) State Route 89: Begin PM 0.0 End PM 19.20 4) State Route 193 Begin PM 0.0 End PM 26.95 B. Area 2 - Placer County 1) State Route 65: Begin PM 0.0 End PM 24.259 2) State Route 193: Begin PM 2.57 End PM 10.427 3) State Route 80: Begin PM 0.0 End PM14.5 C. Area 3 - Sacramento County 1) State Route 5: Begin PM 0.0 End PM 34.6 2) State Route 16: Begin PM 1.66 End PM 27.5 3) State Route 50: Begin PM 0.0 End PM 23.1 4) State Route 51: Begin PM 0.0 End PM 8.8 5) State Route 80: Begin PM 0.0 End PM 18.00 6) State Route 99: Begin PM 0.00 End PM 36.863 7) State Route 244: Begin PM 0.0 End PM 1.077 8) State Route 160: Begin PM 21.0 End 34.9 9) State Route 104: Begin PM 0.00 End 17.6