Specifications include, but are not limited to: A. Access Road: Contractor shall remove all snow from the full width of the access road; beginning at SR-88 and continuing to the winter closure gate located on the southern end. Snow removal must accommodate vehicle parking on both sides of the roadway. B. Southern Parking Lot Loop: Contractor shall remove all snow from the parking lot loop located on the west side of Blue Lakes Road. Snow removal must provide sufficient space to safely enter, park, turn around, and leave the parking lot loop. C. Northern Parking Lot Loop: Contractor shall remove all snow from the parking lot loop located on the northside of Blue Lakes Road. Snow removal must provide sufficient space to safely enter, park, turn around and leave the parking lot loop. D. Restroom Access: Contractor shall remove all snow from the entryways and tops of the vault and portable toilet units. Snow shall not be allowed to damage or block access to the restroom facilities. E. Sign Obstructions: Contractor shall remove all snow in front of the SNO-PARK signs. Snow shall not be allowed to obstruct the signs in any way. F. Removal of Other Obstructions: Contractor shall dispose of downed tree branches, trash or other debris that impede the safe removal of snow and clearing of the SNO-PARK site in appropriate receptacle(s) to avoid moving refuse into snowbanks.