Specifications include, but are not limited to: Widening Harvard Avenue to accommodate a second westbound left turn lane; Removal of the raised island and free right-turn lane at the southwest corner of the intersection; Extension of the southbound left turn lane and southbound right turn lane along Harvard Avenue; Installation of a new Class II Bike Lane; Installation of a new 10-foot wide shared path for bikes and pedestrians on Michelson; Installation of a 3-foot painted buffer between the Class II Bike Lane and the travel lane along Michelson Drive; Installation of Midwest Guardrail Systems and Filterra Biofiltration Systems; Replacement of landscape and irrigation; Removal and replacement of trees; Relocation of storm drain systems; Cold milling, removing, and replacing AC pavement; AC and ARHM pavement surface course overlay; Adjusting valve covers and manhole covers to grade; Removing and replacing damaged concrete curb, gutter, and sidewalk; Modifying curb ramps; and other items not mentioned here, but as required by the Plans and Special Provisions.