1- Networking Headend Scope Work a. Furnish and Install (1) 100 Device in NEMA Enclosure with Network Hub and Transformer b. Software c. Provide Programming to Create System Database d. Provide Programming to Create HVAC System Graphics Including Floor Plans 2- VAV Scope Work (QTY) 32 a. Provide and Install (32) BACnet VAV Controllers W/Built in Actuator and DPT b. Provide and Install (32) Hot Deck Damper Actuators with DPT’s c. Furnish and Install (32) Zone Temperature W/Display, Adjustment and Override d. Furnish and Install (6) CO2 Sensor as Shown on the Plans e. Program and Commission VAV Box Controllers 3- AC Unit Scope Work (QTY) 4 AC-10, 11, 12 & 13 a. Provide and Install (4) BACnet AC-Unit Controllers b. Provide and Install (4) Fan Status CT’s c. Furnish and Install (4) Discharge Air Temperature Sensors d. Furnish and Install (4) Zone Temperature W/Display, Adjustment and Override e. Connect AC Unit Heating, Cooling and Fan Commands f. Program and Commission AC-Unit Controllers 4- AHU Scope Work a. Provide and Install (3) BACnet AHU Controllers to Accommodate Existing Points b. Install BACnet Controllers and Connect Existing I/O c. Replace Existing Temperature Sensors d. Includes Programing to Match Existing SOO e. Includes Commissioning of all (45) Control Points • Connect and Calibrate Coil Discharge Air Temperature • Connect and Calibrate Sump Temperature • Connect and Calibrate Supply Fan CFM • Connect and Calibrate Mixed Air Temperature • Connect and Calibrate Return Air Temperature • Connect and Calibrate Outdoor Air CFM • Connect and Calibrate Leaving Heat Whell Temperature • Connect and Calibrate Outside Air Temperature • Connect and Calibrate Discharge Air Temperature • Connect and Calibrate Return Air Humidity Sensor