Specifications include, but are not limited to: 1 Mobilization and permits (allowance) 1 LS $ $ 2 Erosion and sediment control - 12" dia. compost filter sock 1,370 LF $ $ 3 Erosion and sediment control - 18" dia. compost filter sock 118 LF $ $ 4 Erosion and sediment control - 24" dia. compost filter sock 1,241 LF $ $ 5 Erosion and sediment control - tree protection fence 4,081 LF $ $ 6 Erosion and sediment control - temporary stabilization 1 LS $ $ 7 Erosion and sediment control - rock construction entrance 1 LS $ $ 8 Erosion and sediment control - concrete wash station 1 LS $ $ 9 Erosion and sediment control - temporary inlet protection 6 EA $ $ 10 Erosion and sediment control - temporary inlet seal 4 EA $ $ 11 Demolition & removal of building (Incl. all utilities) and pool 1 LS $ $ 12 Demolition & removal of asphalt paving 7,350 SF $ $ 13 Demolition & removal of gravel paving 4,794 SF $ $ 14 Demolition & removal of fence 30 LF $ $ 15 Demolition & removal of wall 221 LF $ $ 16 Tree removal (individual trees identified on plans) 83 EA $ $ 17 Grubbing and clearing woodland area 3.24 AC $ $ 18 Rough grading and excavation 22,900 CY $ $