The following is a partial listing of work items: Clearing and Grubbing, Roadway Excavation, Removing and Reconstructing Failed Pavement Areas, ARHM, Replacement of PCC Curb and Gutter, Retaining Curb, Cross Gutter, Bus Pad, Drive Approach, Sidewalk and Curb Ramps, Stamped Concrete, Replacement and Adjustment of Utility Covers to Finish Grade, Adjustment of waterline, Fabco CPS, ARS Screen with Bypass Lid, Retaining Wall, Reinforced Concrete Pipes, Storm Drain Manholes, Catch Basins, Trees, Landscaping and Irrigation with 1 year maintenance period, Installation of Traffic Signal and Striping, Signing, Pavement Marking and Markers, Reestablishment of Centerline Ties and Monuments, and Other Items not mentioned above that are required by the Plans and Specifications.