This project includes street and utility improvements on Front Street between Play and L Street, and K Street between Front Street and Second Street. This project also includes Beachfront Park Gateway improvements requiring excavation and grading, pathways, landscaping, and cultural and art element installations on the south side of Front Street between Play Street and L Street. The street work includes the furnishing of the labor, materials, and equipment for the installation of a replacement storm drain system, replacement water mains, fire hydrants, valving and services, sewer main installation, gas line relocation, irrigation piping and controls, curbs, gutters, sidewalks, and pedestrian crossings, a reconstructed road section for Front and K Streets, and new street lighting fixtures, all in accordance with the drawings and specifications