A. The intent of this Agreement is for the Contractor to remove one (1) exterior door access keypad and replace with one (1) complete exterior door card reader access control system. 1. The Contractor will provide all necessary equipment, materials, and labor to remove and replace one (1) exterior door access security keypad with one (1) complete exterior door access control card reader system per manufacturer’s specifications, and all local, state, and federal laws and regulations. 2. Provide system startup, test, and inspection to ensure systems operations. 3. Dispose of and haul away old security access keypad and all related trash and debris from the site. 4. Ensure all necessary precautions and procedures to prevent damage to the building and it’s components B. The Contractor will be expected to provide any or all of the following during the term of this Agreement: • Inspections pertaining to repair work orders. • Consultation/planning on best method to achieve the intended result. • Completion of repair work orders as provided by the EDD Representative. • Identify and report to the EDD Representative any safety hazard, faulty equipment, or other condition encountered during the course of the work at the EDD office which the Contractor determines needing repair or replacement. • The Contractor shall comply with all state, EDD, and local office policies and procedures while on the premises.