ABSTRACT OF OFFERES UPLOADED
**************************************************************************************************************************************************
AMENDMENT 0004
THE PURPOSE OF THIS AMENDMENT IS TO RESPOND TO THE REQUEST FOR INFORMATION (RFI).
******************************************************************************************************************************************************
AMENDMENT 0003
THIS AMENDMENT UPDATES THE WAGE DETERMINATION FROM CA20250007 DATED 6-27-2025 TO CA20250007 DATED 7-18-2025.
******************************************************************************************************************************************************
AMENDMENT 0002
THIS AMENDMENT IS TO EXTEND THE CLOSING DATE TO AUGUST 8, 2025@11:00AM. ALL SUBMISSIONS MAY BE UP TO 6 CALENDAR DAYS PRIOR TO BID OPENING. THIS ALLOWS A SUBMISSION WINDOW FROM SATURDAY, AUGUST 2ND@11:00 AM PST UNTIL 11:00 AM PST ON FRIDAY, AUGUST 8TH. EARLY AND LATE SUBMISSIONS OUTSIDE OF THIS WINDOW WILL NOT BE ACCEPTED. PLEASE REFER TO SECTION 00 22 00; 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID.
**************************************************************************************************************************************************
AMENDMENT 0001
THIS AMENDMENT IS TO EXTEND THE CLOSING DATE TO AUGUST 1, 2025@11:00AM. ALL SUBMISSIONS MAY BE UP TO 6 CALENDAR DAYS PRIOR TO BID OPENING. THIS ALLOWS A SUBMISSION WINDOW FROM SATURDAY, JULY 26TH AT 11:00 AM PST UNTIL 11:00 AM PST ON FRIDAY, AUGUST1ST. EARLY AND LATE SUBMISSIONS OUTSIDE OF THIS WINDOW WILL NOT BE ACCEPTED. PLEASE REFER TO SECTION 00 22 00; 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID:
***************************************************************************************************************************************************
PROJECT TITLE: FY25 PETALUMA RIVER AND ATF CHANNEL MAINTENANCE DREDGING PROJECT, SONOMA COUNTY, CALIFORNIA
PROJECT LOCATION: PETALUMA, CA
THE WORK INCLUDES MAINTENANCE DREDGING OF THE PETALUMA RIVER CHANNEL TO -8-FT (MLLW) PLUS 1-FT OF PAID OVER-DEPTH AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPECIFICATION SECTION 00 10 00 PRICING SCHEDULE AND 01 11 00 SUMMARY OF WORK. MATERIAL FROM REACHES 1 THROUGH 6 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT A CONTRACTOR-FURNISHED UPLAND BENEFICIAL REUSE SITE. MATERIAL FROM REACHES 7 THROUGH 9 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT THE AQUATIC SITE SF-10.