• WILDCAT CANYON RD DRAINAGE IMPROVEMENTS (BID SCHEDULE A) - The work to be done consists of, but is not limited to: traffic control; environmental protections; rehabilitation of storm drain culverts by open trench, and cured-in-place pipe lining; installation of pre-cast drainage inlets; installation of custom, cast-in-place drainage inlets and concrete aprons; cast-in-drilled hole piers;slope stabilization and slide repairs with rip rap; erosion mitigation; reinforced concrete retaining walls; minor concrete; removal and disposal of pavement surfaces and base materials; aggregate base; hot-mix asphalt; removal and replacement of guardrail; and asphalt berms. o Plans, titled Wildcat Canyon Road Culvert Improvements, Specification No. 23-11561-C o General and Special Provisions o Part C - Technical Provisions for Schedule A • FY 2024 STORM DRAIN IMPROVEMENTS (BID SCHEDULE B) - The work to be done consists of, but is not limited to: traffic control; environmental protections; clearing and grubbing; tree removal and root pruning; protection of underground utilities; removal of existing concrete improvements; construction of concrete curb, gutter, sidewalk, driveways, curb ramps, valley gutter, and through drains; construction and rehabilitation of storm drain pipes by open trench, sliplining, and cured-in-place pipe lining; removal and installation of junction boxes, catch basins, and maintenance holes; removal and disposal of pavement surfaces and base materials; aggregate hot-mix asphalt and concrete pavement.