Civil Engineering Work (On-Site and Off-Site) – for more details, see Exhibit C • Base mapping, topographic surveying, and geotechnical investigation • Two commercial driveways with driveway approach for fire truck access • Removal and replacement of eight (8) existing trees for the new commercial driveway construction on a 1:1 ratio. The tree species approved for this area are Poplar, New Zealand Christmas, and Red Maple trees or as approved by the City’s arborist • Fencing for site security shall include, but is not limited to, chain link with vinyl coating and slats, plus vehicle gates and pedestrian access • Installation of one (1) 6” water service, meter, and on-site yard plumbing for fire flow with backflow preventers per City Standards • Installation of two (2) on-site fire hydrants • Installation of one (1) 4” standpipe extending to serve all five (5) building stories • Installation of one (1) 6” sanitary sewer lateral • Installation of a collection system for water used during fire training with a discharge into the new sewer lateral. Provide an isolation valve to prevent stormwater inflow when the system is not in use. • Modify, upgrade, or expand the storm drain system to protect from firefighting water or other contaminants • Comply with National Pollutant Discharge Elimination System (NPDES) MRP C.3 requirements with features such as bioretention areas or rain gardens • Relocation of the existing 3/4” water line (boat washdown/hose bib) to the northern side of the parcel...