1 Submittals- Fire Alarm System Design (Not to exceed 15% of the contract total) 0.0 2 Work Plan Approval 0.0 3 Building 307A, Facility III A Kitchen, First Floor - Rough-In Stage 0.0 4 Building 307A, Facility III A Kitchen, Second Floor - Rough-In Stage 0.0 5 Building 307A, Facility III A Kitchen, Roof Top - Rough-In Stage 0.0 6 Building 307A, Facility III A Kitchen, First Floor – Final Connections 0.0 7 Building 307A, Facility III A Kitchen, Second Floor – Final Connections 0.0 8 Building 307A, Facility III A Kitchen, Roof Top – Final Connections 0.0 9 Building 307A, Facility III A Kitchen First Floor -Testing, Acceptance and Training 0.0 10 Building 307A, Facility III A Kitchen, Second Floor -Testing, Acceptance and Training 0.0 11 Building 307A, Facility III A Kitchen, Roof Top -Testing, Acceptance and Training 0.0