● Design and Engineering services to develop construction level drawings for both the charging station and the solar field as identified on the Site Plan. ● Environmental Technical Studies to support the National Environmental Policy Act. WattEV is responsible for all local land use compliance, as well as coordination of the Preliminary Environment Study (PES) with Caltrans, which is the NEPA-delegated entity on behalf of FHWA. ● Bid and construction assistance (including but not limited to shop drawing review and falsework structural calculation check). The Consultant should prepare the construction bid documents, assist Recipients with bidding, and assume 12 RFI questions and 6 shop drawings to review which should include two revisions per shop drawing.