Specifications include, but are not limited to: A. This section describes the general product and execution requirements related to furnishing and installing the Electronic Access Control and related systems. B. Contractorshall be responsible for providing complete and functional systems as described in this specification and project drawings. C. Contractorshall provide low voltage power and control lines (Belden Access Control Composite Cable or equivalent) to and from power supplies, remotely controlled equipment, and other devices, even though not explicitly indicated on drawings or listed in equipment tables. D. Contractor shall provide related Category 6 horizontal cabling runs from the Telecommunications Rooms or enclosures out to the individual workstation outlets or Work Area Outlet (WAO) to support the Verkada controller connectivity. E. The Owner will furnish and install (OFOI) any required C-10 (CSI, Division 26) related power requirements, including 120VAC circuits, breakers, receptacles, cabling, conduits/raceway and/or any other related requirements for the provision of high voltage power, where necessary. F. The Owner will furnish and install (OFOI) all Ethernet network equipment (switches), provide adequate, available ports for the connectivity of the Verkada controllers, and will be responsible for all configurations, Cybersecurity, performance, and operations of these network systems...