1 Mobilization 1 LS 2 Traffic Control 1 LS 3 Implementation of SWPР, BMPs, and Fugitive Dust Control 1 LS 4 Construction Survey and 1 LS Staking 5 Demolition, Removals and Grading 1 LS 6 Construct PCC Curb & Gutter 3,715 LF 7 Construct Asphalt Concrete Dike 78 LF 8 Construct PCC Straight Curb and Gutter to Rolled Curb Transition 60 LF 9 Construct PCC Cross Gutter on Aggregate Base 3,006 SF 10 Construct PCC Sidewalk 23,850 SF 11 Construct Curb Ramp (only work in addition to constructing New Sidewalk) 11 EA 12 Modify Existing Curb Ramp and Install Detectable Warning Surface 7 EA 13 Construct PCC Commercial Driveway Approach with 4' Wide ADA Accessible Walk 3,438 SF 14 Remove Existing Improvements and Construct PCC Residential Driveway Approach with 4' Wide ADA Accessible Walk 256 SF 15 Construct 7-inch Thick Aggregate Base Course 3,450 TON