1. Removal of existing primary building stairs. 2. Removal of planting, planters and irrigation system. 3. Removal of selective exterior walls and door. 4. Removal of second floor balcony brick pavers and wood decking subfloor. Removal of brick veneer wall finish at balcony. 5. Removal of existing pair of storefront doors on second floor. 6. Addition of new gearless electric traction elevator including but not limited to: CMU hoistway (protruding through roof), cast-in-place concrete pit, electrical and control rooms adjacent to hoistway (wood stud walls), metal deck roof on top of hoistway with automatic smoke vent/elevator vent through roof. Patching of roof structure around hoistway opening and patching of existing roofing. 7. Exterior cement plaster finish on CMU, stud walls, and soffits on exterior side. Gypsum wall board on interior framed walls. 8. Two new doors and one storefront aluminum window 9. New replacement stairs with structural steel stringers, landing, columns, for precast tread/risers. Guard railing consisting of stainless steel tensioned cabling on stairs. 10. Extension of existing balcony deck with new wood framing and decking. New porcelain pavers over entire balcony floor including in Control Room.