The selected design team will be responsible for assessing existing site conditions, coordinating public outreach by presenting at community design workshops, and producing draft and final designs. The design team must consist of a Civil Engineer and Landscape Architect. Final permitting, construction drawings, prevailing wage cost estimates, and a bid package will be required as part of this phase. In addition to furthering key objectives of expanded tree canopy, education, native vegetation, biodiversity, and habitat, the designs must prioritize sustainability and maintenance consideration. Services shall include the following: Project Tasks: 1. Project Management a. Monthly meetings with the City of San Fernando staff to discuss project goals, maintenance requirements, applicable regulations, and design considerations. b. Prepare materials, organize, notify community, and lead three (3) community workshops to present design options and receive input. 2. Surveys and Environmental a. Conduct a topographic survey of Cindy Montanez Natural Park and Pacoima Wash Bikeway. b. Conduct a geotechnical analysis of Cindy Montanez Natural Park and Pacoima Wash Bikeway to inform project Stormwater BMPs. c. Contact utility providers and conduct a utility survey of project area. 3. Design a. Prepare a Concept Design (30%) and make necessary revisions to the Concept Design based on comments from City.' b. Prepare 60% Construction Documents [Plans, Specifications & Estimate (PS&E)] and make necessary revisions to the Concept Design based on comments from City.